San Carlos Creek Pipe Bridge Replacement

Project Details

ROLE
Contractor

OWNER
Confidential

LOCATION
Florida

ARCHITECT
Lunda was contracted to replace an old pipe bridge while the existing pipeline remained in service during construction. We first temporarily supported the existing, crumbling, foundations. Then we installed 14” epoxy coated pipe piles and cross member supports, and secured the existing pipeline to the new bridge.

We demolished the existing foundation, and also installed helical piles for cable tie-down supports, and patched concrete on the existing slope paving.

COMPLETION
2022

Project Description

Lunda was contracted to replace an old pipe bridge while the existing pipeline remained in service during construction. We first temporarily supported the existing, crumbling foundations. Then we installed 14” epoxy coated pipe piles and cross member supports, and secured the existing pipeline to the new bridge.

We demolished the existing foundation, and also installed helical piles for cable tie-down supports, and patched concrete on the existing slope paving.