Slip Mitigation
Project Details
ROLE
Contractor
OWNER
Confidential
LOCATION
West Virginia
COMPLETION
2022
Project Description
Lunda was contracted to stabilize the edge of a pipeline right-of-way. To complete this slip mitigation, Lunda drilled 30” diameter shafts 40’ deep into the bedrock. Lunda then placed a H-pile section and poured concrete to secure/lock everything in place to stabilize the right-of-way for future use.