Project Description
The Cheyenne Connector Pipeline Project provided much-needed incremental takeaway capacity from the DJ Basin in Weld County, Colorado. During construction, the municipal water drainage structures in the construction zone could not be taken out of service due to the need to continually move water/irrigation for farming. Lunda was contracted to install and remove temporary deep sheet pile bore boxes to allow a the new 36” pipeline to safely pass below the municipal water drainage structures.